From first call to power-on.

One team runs every step. You always know what's next.

Step 01

Consultation

We look at your bills, roof, and goals and give you a straight answer on savings and backup.

Step 02

Custom design

Panel layout and battery sizing engineered for your home and rate plan.

Step 03

Permits

We file with your city and utility. You don't touch paperwork.

Step 04

Installation

Our own roof and electrical crews. Typically one to two days on site.

Step 05

Inspection

We meet the inspector and manage utility interconnection.

Step 06

Power on

Permission to operate arrives, you flip the switch, and the meter slows down.

Your roof could be working for you by your next utility bill.

Free design. Real numbers. No pressure.